Industrial Pallet Racks in Kearny, AZ
Industrial pallet racks in Kearny, AZ serve mining contractors and MRO suppliers in the Copper Corridor. Heavy-duty cantilever rack, pallet racks and parts shelving hold equipment and spares on yard-heavy lots.
Buildings are small here, so the yard often does as much storage work as the building.
Copper Corridor Contractor Storage
Kearny sits in the Copper Corridor between the Ray mine complex and the Hayden smelter, about 70 miles northeast of Tucson. Hayden runs a 27,400 ton/day concentrator and one of the few copper smelters left in the U.S., with its own maintenance and warehouse facilities.
Contractors supporting those operations stock wear parts, pumps, hose and structural pieces. That inventory is heavy and irregular.

Heavy-Duty Selective Rack and Parts Shelving
Inside, selective pallet racks with heavy beams and steel decking take crates that are not on clean pallets. Capacities go on load plaques at each row.
Small parts go on shelving near the door, organized by machine or job, so crews can grab and go.
Cantilever Rack on Yard Lots
Commercial and industrial space is scarce. Small flex buildings, around 2,800 SF on large yard lots, are often leased to mining-industry tenants.
Cantilever rack on the yard holds pipe, liners and steel, with arms sized to bundle depth. Outdoor runs get finishes and are planned with monsoon wind in mind.
Installing in a Remote Market
We draw the layout from your measurements and photos, then send an itemized quote. Experienced installation crews we schedule and manage make the trip and install the rack, anchored to the floor.
Other mining-supply towns we serve include Sahuarita and Green Valley. Moving to a bigger lot? See warehouse relocation.
Sizing Rack for Heavy, Irregular Mining Parts
Mining spares rarely arrive on standard pallets. Crates, skids and loose parts each need a different support.
For crates, we use selective rack with steel decking or pallet supports, with beam capacity set to the heaviest crate on each level.
For loose or oddly shaped parts, shelving with heavy decks or floor storage may be better. We mark which items stay on the floor.
On the yard, cantilever columns are sized to the total weight per side, and arms to the deepest bundle. Bases are sized for the arm length.
The CAD layout shows everything. The itemized quote lists rack, shelving, cantilever, freight and installation, with lead time confirmed. The 48-hour quick ship program for standard pallet rack components applies to regular teardrop parts.
Planning a Remote Install
Kearny is about 70 miles from Tucson, so we plan the job to finish in as few trips as possible. Deliveries are staged by area, and crews arrive with the full parts list checked against the drawing.
Yard work is scheduled for the cooler morning hours in summer, and monsoon days are kept open as backup.
If the layout grows later, add-on parts are matched to the original drawing.
Tenants in small flex buildings often run a single forklift for both yard and warehouse. We set aisle widths for that one truck, so it works indoors and out without changes. Rack heights are matched to its lift.
Industrial Warehouse Racking for Yard Lots
Send Us Your Lot and Building
Call (520) 335-3953 or use the form.
Mining Contractor Questions
Nearby Service Areas
Get Heavy Spares Organized
Free layout. Itemized quote.