    Pallet Racks in Florence, AZ

    Pallet racks in Florence, AZ are tied to land being redesignated for industry and to fast housing growth around it. New pallet rack systems for manufacturing, contractor supply and equipment staging make up most requests.

    We draw for the building you have now, with room for the rows you will add.

    Call (520) 335-3953

    Manufacturing Storage for New Development

    Florence is the Pinal County seat, east of Casa Grande and Coolidge. In October 2025 the county approved Project Ranger, a 1,105-acre manufacturing development north of town that could revive the dormant Magma Arizona Railroad.

    New plants need raw-material, WIP and finished-goods storage. We lay out selective pallet racks for each zone and look at pushback rack where a few SKUs run deep.

    Selective rack aisle staged with equipment pallets

    Cantilever for Contractor and Building-Material Supply

    Merrill Ranch, an 8,800-acre community along Hunt Hwy, is zoned for 4.5 million SF of mixed-use, commercial and industrial space. Housing growth drives lumber, pipe, rebar and trim through local yards.

    Cantilever rack takes that material on arms sized to its length and weight. Outdoor runs get finishes for the sun and planning for monsoon storms.

    Data-Center Equipment Staging Rack

    About 1,619 acres of the Dobson Farms plan in north Florence were redesignated from housing to industrial and technology uses, including data centers. Construction phases need staging space for crated equipment, cable reels and spares.

    Staging rack has to take big, heavy crates with wide beam spans and solid or wire decking. We size each level to the heaviest crate and keep aisles wide enough for the truck carrying it.

    Pinal County Install Scheduling

    Rows are set and anchored to the floor by experienced installation crews we schedule and manage. Summer starts are early, because most of these buildings are not air-conditioned.

    We also work in Coolidge and Casa Grande. Moving operations into a new Florence building? See our warehouse relocation page.

    Phasing Pallet Racks With a Growing Operation

    New operations rarely know their full storage need on day one. We draw the whole building, then mark which rows go in first.

    Aisles, row ends and row spacing are set for the full build so later rows drop in without moving anything. Each phase gets its own itemized quote.

    Selective rack covers most early phases because it handles a changing SKU mix. Pushback comes in once pallets per SKU are known.

    For contractor-supply yards, cantilever runs are laid out with the truck route, so long loads come in one side and leave the other.

    For stock teardrop sizes, ask about the 48-hour quick ship program for standard pallet rack components. Heavier and high-density components have their lead time confirmed on the quote.

    Equipment Staging and Truck Access

    Data-center and plant construction brings big crates in on flatbeds. Staging rack works best near the overhead doors with wide aisles for the forklift carrying them.

    We set the lowest level high enough for large crates and size beams to the heaviest one. Upper levels take smaller boxes and spares, so the same row covers both.

    Contractor-supply tenants in Merrill Ranch-area buildings often start small. A few selective bays and one cantilever run cover the first year, with the full layout already drawn for later.

    Start a Florence Layout

    Call (520) 335-3953 or use the form.

    We respect your privacy. Your information will never be shared.

    New Build and Staging Questions

    Plan Storage for a New Plant

    Free layout. Itemized quote.

    (520) 335-3953
    Call Now